Shadow Wood 80 38 B 4 bedroom Single Family House For Sale
8684 Sw 1st Place, Coral Springs, FL 33071

$728,000
Vendido
Mila Bogatov
Mila Bogatov
Corredor Inmobiliario

Detalles


  • Número MLS:F10517610
  • Tour virtual: SÍ
  • Precio: $763,900
  • Precio vendido: $728,000
  • Tamaño: 2049 pie² / 190 m²
  • Precio por Pie / Metro: $355 / $3,824
  • Habitaciones:4
  • Baños Completos:2
  • Impuesto anual:$10,556
  • Año de construcción:1985
  • Frente al agua:SÍ
  • Fecha de listado:July 30, 2025
  • Fecha Vendido: December 3, 2025
  • Días en el Mercado:126

Descripción


Renovated Waterfront 4 Bedroom 2 Bath with Pool! This spacious home features an Open Concept, Porcelain Tile throughout, Impact Windows & Doors, a Solar Hot Water Heater, and Volume Ceilings. The Chef's kitchen offers double ovens, granite counters, solid wood cabinets with loads of features for your convenience, stainless steel appliances, & a wine fridge. Primary Suite has amazing pool view, dual closets, & a stunningly renovated cabana bath with an enormous shower. You'll love how open & light-filled the home is throughout. A unique opportunity to add dock w/water access for boats/jet skis. It's situated on a quiet back street on a huge lot with lots of green space, an over-sized patio w/cool deck pavers, & a pool equipped w/saltwater option. Parks, shopping, Dining & more are close by.

Características


  • Piso:Tile
  • Característica Interior:BedroomOnMainLevel, DualSinks, FirstFloorEntry, HighCeilings, MainLevelPrimary, WalkInClosets
  • Característica exterior:Fence, Patio, SecurityHighImpactDoors
  • Frente al agua:CanalFront, IntersectingCanal, Other

Localización


Información requerida
Mila Bogatov
Mila Bogatov
Corredor Inmobiliario