Silver Falls 5 bedroom Single Family House For Sale
12831 Sw 45th Dr, Miramar, FL 33027

$780,000
Vendido
Mila Bogatov
Mila Bogatov
Corredor Inmobiliario

Detalles


  • Número MLS:A11390187
  • Tour virtual: SÍ
  • Precio: $815,000
  • Precio vendido: $780,000
  • Tamaño: 3256 pie² / 302 m²
  • Precio por Pie / Metro: $240 / $2,579
  • Habitaciones:5
  • Baños Completos:3
  • Mantenimiento:$155
  • Impuesto anual:$6,124
  • Año de construcción:2004
  • Mascotas Permitidas:SÍ
  • Fecha de listado:May 19, 2023
  • Fecha Vendido: July 25, 2023
  • Días en el Mercado:66

Descripción


Have a big family? Spacious 5-bedroom, 3-bathroom home in West Miramar's Silver Fall community that offers 24-hour security with a clubhouse that offers a pool and gym. The living area with laminate wood floors and stairs to the upper level. The master bedroom is enormous, featuring a sitting/lounge area, his and hers vanity, a Roman tub, a shower, and walk-in closets. Perfect for large families, with a covered back patio, paved patio perimeter, and accordion hurricane shutters on upper windows. The backyard is completely fenced and enjoy the pool on sunny days. Renovated and spacious kitchen, ideal for any homeowner.Very low association. There is one bedroom and one bathroom on the first level. THE MASTER BEDROOM HAS A BONUS ROOM THAT COULD BE 6TH BEDROOM.

Características


  • Piso:Hardwood, Wood
  • Característica Interior:BedroomOnMainLevel, FirstFloorEntry, CentralVacuum
  • Característica exterior:Fence, Other, Patio, StormSecurityShutters

Localización


Información requerida
Mila Bogatov
Mila Bogatov
Corredor Inmobiliario