Downtown Doral South Phas 3 bedroom Condo For Sale
4672 Nw 84th Ave, Unit 4672, Doral, FL 33166

$850,000
Vendido
Mila Bogatov
Mila Bogatov
Corredor Inmobiliario

Detalles


  • Número MLS:A11460478
  • Tour virtual: SÍ
  • Unidad numérica:4672
  • Precio: $890,000
  • Precio vendido: $850,000
  • Tamaño: 2946 pie² / 274 m²
  • Precio por Pie / Metro: $289 / $3,106
  • Habitaciones:3
  • Baños Completos:3
  • Medios Baños:1
  • Mantenimiento:$163
  • Impuesto anual:$12,225
  • Año de construcción:2019
  • Mascotas Permitidas:SÍ
  • Fecha de listado:September 28, 2023
  • Fecha Vendido: June 16, 2024
  • Días en el Mercado:261

Descripción


Presenting this exquisite corner 4-story Townhome located in URBANA Downtown Doral, conveniently close to schools, parks, restaurants, and shops. This exceptional unit boasts a media room, a skyview terrace with a BBQ area, a private elevator, a 2-car garage, and much more. The interior features brand new tile flooring, floor-to-ceiling European kitchen cabinets, European backsplash tiles in the kitchen, upgraded GE Profile appliances, a full laundry area equipped with modern Samsung washer and dryer, and a laundry sink with a stone top. Additionally, the property comes with smart apps for managing the A/C, doorbell, range, washer and dryer, and an entrance digital key. This Townhome represents a fantastic investment opportunity in a highly desirable location.

Características


  • Piso:Carpet, CeramicTile
  • Característica Interior:BedroomOnMainLevel, BreakfastArea, FirstFloorEntry, KitchenDiningCombo, Pantry, WalkInClosets, Elevator
  • Característica exterior:Balcony, Barbecue, SecurityHighImpactDoors, Porch

Localización


Información requerida
Mila Bogatov
Mila Bogatov
Corredor Inmobiliario