Ocean Isle Estate 4 bedroom Single Family House For Sale
48 S Andros Rd, Key Largo, FL 33037

$3,100,000
En venta
Mila Bogatov
Mila Bogatov
Corredor Inmobiliario

Detalles


  • Número MLS:A11984131
  • Tour virtual:
  • Precio: $3,100,000
  • Tamaño: 3024 pie² / 281 m²
  • Precio por Pie / Metro: $1,025 / $11,034
  • Habitaciones:4
  • Baños Completos:4
  • Impuesto anual:$18,467
  • Año de construcción:1969
  • Frente al agua:
  • Fecha de listado:March 16, 2026
  • Días en el Mercado:134

Descripción


Welcome to a stunning, fully remodeled coastal retreat in the highly sought-after Ocean Isle Estates. This exceptional 4-bedroom, 4-bathroom residence offers over 3,000 square feet of living space and showcases breathtaking open water views from multiple vantage points. Designed for both relaxation and entertaining, the home features two spacious master suites, a beautifully updated interior, and a separate lower-level 1-bedroom/1-bath suite complete with a recreation area—perfect for guests or extended family. Step outside to your private waterfront oasis, where a pool sits right at the water’s edge, complemented by a 17,000 lb boat lift—ideal for boating enthusiasts looking for direct ocean access. The property also boasts a rare two-car garage along with ample additional parking, a durable metal roof, and impact windows and doors for peace of mind. Situated on an 8,400 sq ft lot in one of Key Largo’s premier neighborhoods, this home combines modern upgrades with the laid-back luxury of the Florida Keys lifestyle.

Características


  • Piso:Concrete, CeramicTile
  • Característica Interior:BedroomOnMainLevel, FirstFloorEntry
  • Característica exterior:Deck, SecurityHighImpactDoors
  • Frente al agua:CanalFront, OceanAccess

Localización


Información requerida
Mila Bogatov
Mila Bogatov
Corredor Inmobiliario