Savannah Plat 1 4 bedroom Single Family House For Sale
13209 Nw 12th Ct, Sunrise, FL 33323

$699,000
Nuevo En venta
Mila Bogatov
Mila Bogatov
Corredor Inmobiliario

Detalles


  • Número MLS:A12026372
  • Tour virtual:
  • Precio: $699,000
  • Tamaño: 1847 pie² / 172 m²
  • Precio por Pie / Metro: $378 / $4,074
  • Habitaciones:4
  • Baños Completos:2
  • Medios Baños:1
  • Mantenimiento:$220
  • Impuesto anual:$13,142
  • Año de construcción:1990
  • Fecha de listado:May 27, 2026

Descripción


Stunning Turn-Key Home in Sawgrass Mills Residence~Osprey West. Discover the perfect blend of luxury and comfort in this beautifully remodeled home.This two-story gem features 4 spacious bedrooms 2.5 luxurious bathrooms, 2-car garage, & Laundry Room. Outdoor Oasis, Enjoy summer days in the stunning oversized pool surrounded by a beautifully landscaped backyard, perfect for entertaining.As you step inside, you'll be greeted by an abundance of natural light streaming through large windows, high volume ceilings, & an elegant staircase. A brand new kitchen is a chef's dream, featuring oversized white quartz countertops, sleek white cabinetry & top-of-the-line brand new appliances that make cooking a pleasure. The primary bedroom opens with double doors to a large bedroom, leading to a spa-like bathroom complete with a walk-in closet, ensuring a tranquil retreat. Each of the additional bedrooms is generously sized, equipped with plenty of closet space to accommodate all your storage needs.You'll enjoy convenient access to top-notch schools—both private & public—as well as easy access to highways, making commuting a breeze. Roof just 6 yrs, 2020, new water hearter 2026, new appliances, washer & dryer 2026.Don't miss this incredible opportunity to own this beautiful home.

Características


  • Piso:Laminate, Tile
  • Característica Interior:BreakfastArea, ClosetCabinetry, DiningArea, SeparateFormalDiningRoom, DualSinks, EntranceFoyer, EatInKitchen, FirstFloorEntry, GardenTubRomanTub, KitchenIsland, SeparateShower, UpperLevelPrimary, VaultedCeilings, WalkInClosets, Attic
  • Característica exterior:Deck, Fence, Patio, Shed

Localización


Información requerida
Mila Bogatov
Mila Bogatov
Corredor Inmobiliario